New Assignments

A new assignment is typically required when any field in the assignment tab changes.

Shifts, work location, and dates contained in the Assignment tab affect the Roster and scheduling. Only one assignment must be active at a time. It is important that dates in the From and Through fields do not overlap across assignments. Be sure to remove any future checked records that were placed on the person’s calendar and the roster that are no longer valid.

The From field represents the start date of the Assignment. The Through field represents the end date of the Assignment.

Rule of thumb:

Security permission settings control the ability to edit and create new assignments. To retain these permission settings intact ensure no time gaps exist between inactive and active assignments.